2833 Kearney Creek Lane - Lexington, KY
Thursday, November 7, 2013
Blinds and Maple tree
9/21/2013
Hung up 6 blinds and planted a maple tree today.
Outside front/ back
8/19/2013
Front of the house with shutters added.
Landscaping coming in the fall.
Steps added to back, swing hung up and air chair too.
Kentucky Bluegrass
5/17/2013
Finally some sod!
Watering every day now! Where will the Air Chair go?
Volleyball court? Horseshoe pits? Fire pit? Tiki torches? Garden?
Guest Bathroom
5/12/2013
Martha made the curtain.
Master Bedroom
5/11/2013
Plenty of room here.
Laundry Room
5/10/2013
Looking from inside towards garage.
Closet Maid bench and cubes - and motion detect light.
Sewing Room
5/6/2013
Martha sewing room is all set up. Thanks for
the wall hanging Chelle!
Guest Room
5/3/2013
Ready for your visit!
Kitchen
4/30/2013
The kitchen looks great! I cut some boards at 22.5 degree to go
above the cabinets and Martha did the rest.
Great Room
4/28/2013
Moved in yesterday! Now, the unpacking begins! Michelle,
Alan, Boone, and Nick helped load the 16 foot truck. It took 3 trips.
Eat in dining area.
Kitchen Appliances
4/26/2013
That's a big refrigerator!
Closing today and moving tomorrow 4/27.
Carpet
4/23/2013
Carpet installed in all 3 bedrooms, bonus room
and stairs up to bonus room.
Master bedroom.
Kitchen Sink
4/22/2013
Martha says - she likes that she can see a silo
when standing in front of her sink.
Floor Stained
4/21/2013
This is from laundry room which has vinyl floor.
This is from back of house looking towards the front door.
2 More Weeks
4/20/2013
They were sanding the floors - we are ready to
move in - but not til Derby day 5/4.
Lovely floor
4/19/2013
This floor feels good to walk on!
Tile grouted
4/18/2013
Master bath looking good.
Granite backsplash
4/17/2013
Typically, they would have outlets above a 4" backsplash which
makes the bar too high. They were going to tile the backsplash but
Ed, the decorator suggested a slightly larger backsplash and
extending the outlets - worked great!
Wednesday, November 6, 2013
Lights and cleaning
3/31/2013
Looking back towards main entrance. Swept out and
shopvac out most of the dust.
Walkway and light fixtures
3/29/2013
Level walkway into house. I can't wait to see
grandkids riding bikes!
Ceiling fan and some of the lights were done today.
Vents and ready for walkway
3/28/2013
Return vents up high.
Grade set for sidewalk and walkway to front porch.
Paint and closet shelves
3/27/2013
Kitchen pantry shelves. The outlets and switches were installed
too. Waiting on electrical inspection and heat.
Finish carpentry
3/24/2013
Bookcases on each side of fireplace are almost done.
Railing on steps - looks like it is time to paint.
Gutters and down spouts
3/23/2013
Not sure when these were installed. 1 continuous gutter on 2 sides
and back. Electrical is ready for inspection and meter.
Cabinets
3/22/2013
Martha has picked out the granite and light fixtures. Chris and Brad
got to see the house before going to the NCAA 2nd round games at Rupp.
Master bath cabinets.
Kitchen cabinets
3/20/2013
Martha likes her kitchen cabinets. The bathroom
ones are going in too.
Cabinets delivered
3/19/2013
The cabinets were delivered today and should be
hung tomorrow.
Doors and trim
3/18/2013
View from kitchen looking out back windows. Most
of the interior doors are hung.
Rocked in 1 day
2/28/2013
Looking from great room towards dining area.
Formal dining room looking up at dormer window.
Foam insulation
2/27/2013
The bonus room is above the garage and we decided to foam
insulate all around. This will make it easier to heat/cool and keep
the noise out. Stay tuned for Rock'n Roll!
In the pink
2/26/2013
Insulation for the outside walls. A rainy day in K.Y.
Driveway
2/25/2013
Slight incline and some landscaping started.
Newer Posts
Older Posts
Home
Subscribe to:
Posts (Atom)