2833 Kearney Creek Lane - Lexington, KY

Wednesday, November 6, 2013

Cabinets


3/22/2013
Martha has picked out the granite and light fixtures. Chris and Brad 
got to see the house before going to the NCAA 2nd round games at Rupp.



Master bath cabinets.

Posted by Liss at 12:50 PM
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

Blog Archive

  • ▼  2013 (50)
    • ▼  November (50)
      • Blinds and Maple tree
      • Outside front/ back
      • Kentucky Bluegrass
      • Guest Bathroom
      • Master Bedroom
      • Laundry Room
      • Sewing Room
      • Guest Room
      • Kitchen
      • Great Room
      • Kitchen Appliances
      • Carpet
      • Kitchen Sink
      • Floor Stained
      • 2 More Weeks
      • Lovely floor
      • Tile grouted
      • Granite backsplash
      • Lights and cleaning
      • Walkway and light fixtures
      • Vents and ready for walkway
      • Paint and closet shelves
      • Finish carpentry
      • Gutters and down spouts
      • Cabinets
      • Kitchen cabinets
      • Cabinets delivered
      • Doors and trim
      • Rocked in 1 day
      • Foam insulation
      • In the pink
      • Driveway
      • Michelle visits
      • And the bricks go on and on
      • Martha on front porch
      • More bricks
      • A good day for laying bricks
      • Floor Plan
      • Floored
      • Floor Joists
      • Block foundation
      • Gravel for crawl space
      • Site Plan
      • Footer dug and poured
      • Done Digging
      • Digging
      • Rocks and Flags
      • Defining the property
      • Clearing some brush
      • New House

About Me

Liss
View my complete profile
Simple theme. Powered by Blogger.